Line 70: Line 70:
   * After a few seconds, the sensor should appear as the "new device"   * After a few seconds, the sensor should appear as the "new device"
   * If desired, the sensor can be removed or it can be assigned to another device   * If desired, the sensor can be removed or it can be assigned to another device
 +<WRAP pagebreak></WRAP>
 ==== Power plant connection ==== ==== Power plant connection ====
  