Previous revision
en:robotina_charger:commissioning:pv_inverter [2022/12/09 13:46] – [PV inverter] gdzampoen:robotina_charger:commissioning:pv_inverter [2022/12/09 14:59] (current) – [EVSE and PV inverter connection] gdzampo
Line 18: Line 18:
 2. connecting PV inverter by Modbus TCP to EVSE (only for SolarEdge inverters) 2. connecting PV inverter by Modbus TCP to EVSE (only for SolarEdge inverters)
  
-=== SolarEdge inverter over Modbus TCP ===+=== EVSE and PV inverter connection ===
  
 |< 700px >| |< 700px >|
-^ EVSE and PV inverter connection | 
 |  {{ :hiq_energy:robotina_charger:rc_pv_inverter_connection_router.png?direct&800|}}  | |  {{ :hiq_energy:robotina_charger:rc_pv_inverter_connection_router.png?direct&800|}}  |
 +
 +To add inverter on HEMS configurator:
 +  *   on settings page inside source table, select SolarEdge inverter. Please see [[en:robotina_charger:software#settings|]]
 +  *   on io mux page set IP address for inverter. Please see [[en:robotina_charger:software#io_mux|]] 
  
 To setup Modbus TCP on Inverter using SetApp: To setup Modbus TCP on Inverter using SetApp:
   *   Select Site Communication menu    *   Select Site Communication menu 
      * RS485-1 -> Protocol -> SunSpec (Non-SE Logger)      * RS485-1 -> Protocol -> SunSpec (Non-SE Logger)
-     * RS485-1 -> Device ID, and enter the number 1. +     * RS485-1 -> Device ID, and enter the number 1 
-     Select Modbus TCP and set to Enable. +     * Modbus TCP and set to Enable 
-     To modify the *TCP port, select Port, set the port number to 502+     set TCP port to 502
-     *  +
  
-*TCP port is 1502 by default.+**Note**:\\ The TCP server idle time is 2 minutes. In order to leave the connection open, the request should be made within 2 minutes.\\ It is important to follow rules above, firstly to set HEMS configurator following Inverter setup due to 2 minutes time frame.