en:robotina_charger:commissioning:pv_inverter

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
en:robotina_charger:commissioning:pv_inverter [2022/12/09 14:10] – [EVSE and PV inverter connection] gdzampoen:robotina_charger:commissioning:pv_inverter [2022/12/09 14:59] (current) – [EVSE and PV inverter connection] gdzampo
Line 34: Line 34:
      * set TCP port to 502      * set TCP port to 502
  
-**Note**:\\ The TCP server idle time is 2 minutes. In order to leave the connection open, the request should be made within 2 minutes.\\ It is important to follow rules above, firstly to set HEMS configurator following Inverter setup.+**Note**:\\ The TCP server idle time is 2 minutes. In order to leave the connection open, the request should be made within 2 minutes.\\ It is important to follow rules above, firstly to set HEMS configurator following Inverter setup due to 2 minutes time frame.
en/robotina_charger/commissioning/pv_inverter.1670595056.txt.gz · Last modified: 2022/12/09 14:10 by gdzampo